Basty Shalgah – Kany Beszra Road & Bridge Design

Design of a 28.4 km road and a 520 m bridge, supported by a dedicated hydrology study of the Basty Shalgah Wadi.

Erbil Governorate – IraqClient · KRG Ministry of Construction & Housing2023

28.4 km

Road length

520 m

Bridge span

1

Wadi hydrology study

The Challenge

A new 28.4 km road and a 520 m bridge crossing the Basty Shalgah Wadi required geometric design integrated with a rigorous understanding of the wadi's hydrology and flood behaviour.

Our Solution

Point Path delivered the full road and bridge design alongside a hydrology study of the Basty Shalgah Wadi, ensuring the alignment, drainage and structure were engineered for the catchment's flow regime.

Outcomes

Results delivered

28.4 km road corridor designed
520 m bridge engineered for the wadi crossing
Hydrology study integrated into the design

Survey methods

Geometric designHydrology studyDrainage design

Technologies

Autodesk Civil 3DHydraulic modellingCorridor survey

Project location

Erbil Governorate – Iraq

Interactive map integration point — connect your preferred mapping provider here.

Services applied on this project

Start a conversation

Let's map the path to your next project.

Tell us what you're building. We'll bring the survey, the design, and the delivery — with the precision your project demands.